Tuesday, March 15, 2011

PERSPECTIVE DRAWING

SALAM SEMESTER 5

TAKE NOTE FOR THIS NEW INFORMATION!!

PLEASE PROVIDE SIX (6) EXTERIOR PERSPECTIVES IN YOUR PRESENTATION BOARD.

INTERIOR PERSPECTIVE IS NOT NECESSARY BUT IF PROVIDED IS AN ADDED ADVANTAGE.

PLEASE CAPTURE ARIAL VIEW FOR THE OVERALL BUILDING AND A FEW INTERESTING ANGLE TOWARDS THE BUILDING.

ANY QUESTION??

JIMISAN

Thursday, March 10, 2011

Submission

PUO School of Architecture.

WORKING DRAWING
Submit on 11 March 2011,not later than 12.30 pm.... 12.35pm considered late submission.
BTN Submit on 14 March 2011, not later than 10.00am

There will a lecture input on presentation drawing and model
on 14 March 2011 at 11.00 am in Architecture Lab.

PRESENTATION DRAWING.
Submit on 21st March 2011, not later than 12.30pm and present on 23rd March
BTN Submit on 23rd March 2011 not later than 12.30pm and present on 25th March


PRESENTATION DAY
When to submit your model ? >> Please bring and show your model when you present your design, present your design with your model as a tool to help and present your ideas to the client.

Basically,
Student who submit on 21st March are required to present your design on 23rd March at 8.30am sharp. (So we can start early and you can rest at bed quickly ^_^)
While students who submit on 23rd March are required to present on 25th March 2011.

Students who have problems to present on 25th , you have to present on 23rd and vice versa. Thank you

So you know you have to present on that day so please prepare all the masking tape, tools and ways to pin up your own drawing. Please remember to take all your drawings at the drawing room early at 8am in the morning as we want to start at 8.30am.


The next information strictly for KSS students only.

Working Drawing submit on 13 March 2011
Presentation Drawing submit on 26 March 2011
Presentation Day + Model on 2nd April 2011

Any question, you can ask En. Amer, En Yusri, Pn. Phady, Pn Latifah...All the best from Us.
Write up by one_sue

Sunday, March 6, 2011

New Info : Latest Update : Working Drawing

New Scale (as mentioned in class on Wednesday : 3rd March 2011)

Location and Key Plan : N.T.S
Plans, Elevations, Sections : 1:150
Site Plan : 1: 250
Typical Section : 1:50
Door and Window Schedule : 1:50

The submission format as mentioned and shown in class.

Saturday, March 5, 2011

Working Drawing Checklist

Attached is the checklist for Working Drawing as a guide for Sem5, please check every single task , either completed or not. Thanks ..Enjoy Designing ^__^